Pular para conteúdo

Work Order - User Guide

The Work Order (WO) is SGI's professional system for detailing the work on a project. It replaced the old "Simple Scope" (v3.0+), bringing formal structure from the American construction industry.


1. What is a Work Order

A Work Order is a formal document detailing everything that will be done on a project, with:

  • Complete Header: WO number, job number, customer, address, date
  • Dynamic work categories managed by the admin (via Service Catalog)
  • Detailed items with service, action, type, quantity, unit, room, price
  • Price with breakdown from 4 possible sources
  • Simplified status: draft or approved (reversible)
  • Export/Import in PDF

2. Where to find it

The Work Order is in the "Work Order" tab in the project detail (formerly called "Escopo" / Scope).

See the Projects Guide for how to navigate to the project.


3. How to create a Work Order

There are 3 ways:

3.1 Create a blank WO

The most direct way when you already know what you're doing:

  1. Open the project
  2. Go to the "Work Order" tab
  3. Click "Criar WO em branco" (Create blank WO)
  4. The WO is created in draft mode with the header already filled with project data
  5. Add items manually (see section 9)

The fastest way when you're describing the work on site:

  • Describe by text: "I need a WO for the Rua das Flores project"
  • Send photos of the location — the AI identifies rooms, materials, dimensions
  • Record audio while walking through the location describing the work
  • Send a walkthrough video

The AI organizes everything into the categories automatically and you review it.

See the Chat Guide for the complete flow.

3.3 Importing an external PDF

If you received a ready Work Order from another system (customer, partner, estimating software):

  1. In the Chat, send the PDF file (up to 10 MB)
  2. The AI analyzes and extracts the header, customer, and items
  3. You review the preview with 3 columns: what came in the PDF, the matching service in the system, and the final value
  4. Unrecognized items show a "Classify" badge — you choose the service manually
  5. Confirm and the WO is created in the project
flowchart LR
    A[User sends PDF in Chat] --> B[AI analyzes via Gemini]
    B --> C[3-column preview: PDF / System / Final]
    C --> D{Items with Classify badge}
    D -->|Admin picks service| E[Item mapped]
    D -->|Already recognized| E
    E --> F{User confirms}
    F -->|Confirms| G[WO created as draft]
    F -->|Cancels| H[Discard]

4. Complete Work Order structure

The header has all identifying information:

Field Example Required
Work Order Number WO0001-14547 Yes (auto-generated in SGI)
Job Number 25-1959-RPR Yes
Job Name 590 Indigo Drive - Rabiee, Sarah Yes
Project Manager Name of the responsible employee Yes
Work Order Date WO date (ISO) Yes

Editing the header

Admins can edit the header by clicking "Editar WO" (Edit WO) while the WO is in draft. You can change jobName, projectManager, workOrderDate, customer, and jobAddress.

Customer

Field Example
Name Sarah Rabiee
Address 590 Indigo Drive
Phone +1 (321) 555-0100
Email sarah.rabiee@email.com

Job Address

Field Example
Street 590 Indigo Drive
City Orlando
State FL
Zip 32828

Categories and Items

WO categories come from the Service Catalog — the admin manages which categories and services exist. Each category groups work items (specific tasks). A WO has multiple categories, each with multiple items.

📖 See the Service Catalog Guide to understand how the admin configures categories.


5. Structure of a work item

Each item within a category has:

Field Description Example
Service Which catalog service Paint trim/casing (category PNT)
Action Action type Install / Remove / Detach & Reset
Type Classification Labor / Material / Equipment
Quantity How much 100
Unit Unit of measurement SF / LF / EA / SY / HR
Room Room/location Bathroom
Notes Optional note * To frame shower curb
Unit Price Unit price (admin only) $4.50
Total Price Quantity × Unit Price (admin only) $450.00

Units of measurement

Abbreviation Name Typical use
EA Each (Unit) Countable items (sink, toilet, door)
SF Square Feet Areas (walls, floors)
LF Linear Feet Lengths (baseboards, piping)
SY Square Yards Large areas (carpet)
HR Hours Labor time

Actions

Action Meaning
Install Install (add new)
Remove Remove (demolish, take out)
Detach & Reset Disassemble, store, reassemble later

6. Price with breakdown (4 sources)

Each item can have its price defined by 4 different sources. The admin chooses which to use:

Source Description When to use
default Default price from service catalog Always available as a starting point
group_override Special price from Client Group (VIP) Project linked to a group with custom prices
pdf Price extracted from imported PDF When WO came from a PDF file
manual Price typed manually by admin When no automatic source fits

Automatic priority

When multiple sources are available, the system suggests this priority: manual > pdf > group_override > default

The admin can pick any source via radio button in the item edit dialog.


7. Work Order Status

The Work Order has 2 statuses — and the transition is reversible:

stateDiagram-v2
    direction LR
    [*] --> draft: Create via Chat/Import/Blank
    draft --> approved: Admin approves
    approved --> draft: Admin reverts to draft

    classDef active fill:#ffa726,stroke:#fff,color:#000
    class approved active
Status Meaning Who changes it
Draft (draft) Under construction, editable Employee or admin
Approved (approved) Ready for execution Admin (mandatory action)

Reversible

Admin can click "Voltar para rascunho" (Revert to draft) when the WO is approved — this allows editing again. The audit log preserves the full history of all transitions.

Removed statuses

The statuses ready_for_review, in_progress, and completed have been removed. The flow is now simple: draftapproved.


8. Who sees what (need to know first)

Administrator / Super Admin

Sees everything: - All header fields - All categories and items - Unit and total prices and price source breakdown - Edit, approve, revert, delete, export PDF buttons

Employee

Sees everything EXCEPT prices: - Complete header - Categories and items - Task, action, type, quantity, unit, room, notes - Does not see: unitPrice, totalPrice, WO totalCost

Why don't employees see prices?

SGI serves companies that don't want to expose margin/costs to the operational team. Employees need to know what to do and how much (quantity), but not how much it costs. If you need a specific employee to see prices, promote them to admin.


9. Adding items (via Service Catalog)

Editing only in draft

Items can only be added/edited while the WO is in draft. Once approved, everything is read-only until the admin reverts.

How to add an item

  1. Expand (or create) the desired category
  2. Click "+ Adicionar item" (+ Add item)
  3. In the dialog, select:
  4. Category — dropdown with catalog categories
  5. Service — dropdown with services in the chosen category
  6. The action, type, unit, and price fields are auto-filled with the service's defaults
  7. Adjust quantity, room, notes, and price source as needed
  8. Save

How to edit an existing item

  1. Click the edit icon next to the item
  2. Change fields: quantity, room, notes, price source, manual price
  3. Click "Salvar" (Save)

How to delete an item

  1. Click the trash icon next to the item
  2. Confirm in the dialog
  3. Item is removed (snapshot preserved — old WOs are not affected)

10. Editing the WO header

Admin can edit the header while the WO is in draft:

  1. Click "Editar WO" (Edit WO) at the top of the Work Order
  2. Change: jobName, projectManager, workOrderDate, customer, jobAddress
  3. Save

11. PDF Export

Admin can generate a professional PDF of the complete Work Order to send to the customer or archive.

How to generate

  1. On the WO, click "Download PDF" in the header
  2. Wait for generation (a few seconds)
  3. The PDF is downloaded automatically

The PDF contains:

  • Complete header with logo, numbers, dates, customer
  • All organized categories and items
  • Prices (only if the one generating is an admin)
  • Signatures (fields for customer and responsible party)

Important Rules

Required permissions

Operation Super Admin Admin Employee
View Work Order (without prices) Yes Yes Yes (if project assigned)
View prices Yes Yes No
Create blank WO Yes Yes Yes
Create WO via Chat Yes Yes Yes (if project assigned)
Import WO from PDF Yes Yes Yes
Edit items (in draft) Yes Yes Yes
Edit header (in draft) Yes Yes No
Approve WO Yes Yes No
Revert to draft Yes Yes No
Delete WO Yes Yes No
Generate PDF Yes Yes Yes (without prices)

Validations that block

Items only editable in draft

Trying to edit an item when the WO is approved returns an error. The admin must first revert to draft.

PDF Import has a 10 MB limit

PDFs larger than 10 MB are rejected on upload. If your external WO is large, try compressing the PDF or splitting it into parts.

Service soft delete

If a catalog service is deactivated after the WO was created, items that use it are preserved (snapshot freezes name, category, action, type, unit). The WO is not affected.

System defaults

Setting Value
Initial status draft
Number format WO{YY}{MM}-{5-digit SEQUENCE} (e.g., WO2601-00001)
Visible prices Admin/superadmin only
Default price source default (catalog)
Import: minimum confidence No block (always accepts, but warns)

Quick summary

You want to... Do this...
Create blank WO Work Order tab > "Criar WO em branco"
Create WO via AI Chat - "I need a WO for..."
Import WO from PDF Chat - send the PDF file
Add item WO in draft > "+ Adicionar item" > Category > Service
Edit header WO in draft > "Editar WO"
Approve WO (admin) WO in draft > "Aprovar"
Revert to draft (admin) Approved WO > "Voltar para rascunho"
Generate PDF WO > "Download PDF"
Delete WO WO > "Excluir" (admin only)